Production of railway sleepers

Automated production of railway sleepers in concrete.

References

Contractor

Vigier

Industry

Automotive

Key properties

  • Handles concrete up to 55 tons
  • Reinforcement 40 seconds
  • Reversible
  • 20 seconds cycle time

solution

Automated production of railway sleepers in concrete. The machine pulls in pre-cast railway sleepers with a total weight of up to 55 tonnes. The sleepers are stopped in the correct position and then cuts. The machine cuts through four sleepers with a reinforcement of 40 seconds and then unloads them automatically. This process is repeated every 80 seconds. The sleepers then turn 180 degrees to end in the correct position.

Tools

Servo Systems

Servo Systems

Control systems with interpolation, motors with precise positioning and speed control.

References

Download lorem ipsum

To download this document we would like you to register your contact information with us. Please fill out the form below.

I agree to receive the following through Email*